Brisbane, Queensland · Inner-urban residential tower

443 Queen Street, Brisbane

SupportedMOCKOccupancy

Australian inner-urban prefabrication as practiced, not as promised in a press release.

Dwellings
Unknown / insufficient evidence
GFA
Unknown / insufficient evidence
Value
Unknown / insufficient evidence
Duration planned / actual
— / —

Evidence confidence · 52%

MMC Intensity

74 / 100

Estimated
Structure82
Façade78
MEP55
Volumetric content35
Digital integration70
Site assembly dependency40

Evidence confidence · 52%

A serious Australian industrialised project. Intensity is not occupancy proof of whole-system savings.

Not a sustainability rating. High intensity can still fail coherence.

Coherence Score

Unknown / insufficient evidence

Cost, defects, embodied energy and operating energy are not assembled as an evidence pack here.

  • Embodied energy · Unknown · unknown
  • Transport / logistics · Unknown · unknown
  • Construction time · Unknown · unknown

Building anatomy

Factory → transport → site → operation, where known.

structure
Prefabricated structural system — reported
facade
Prefabricated — reported
bathrooms
Prefabricated wet areas — reported

Timeline

Planned versus actual, when both exist.

  1. Announcement

    2010s

  2. Design

    —

  3. Approval

    —

  4. Contract

    —

  5. Manufacture

    —

  6. Shipping

    —

  7. Installation

    —

  8. Completion

    —

  9. Occupancy

    Reported complete

Supply chain

Performance

Unknown / insufficient evidence