Changsha, Hunan · High-rise volumetric steel

Mini Sky City / T30 (Changsha)

ReportedMOCKOccupancy

Canonical reported case of extreme assembly speed. MMC Sentinel keeps the claim, the missing independent timing, and the unmeasured entropy boundary in the same frame.

Dwellings
Unknown / insufficient evidence
GFA
Unknown / insufficient evidence
Value
Unknown / insufficient evidence
Duration planned / actual
/

Evidence confidence · 44%

MMC Intensity

88 / 100

Estimated
Structure90
Façade80
MEP85
Volumetric content92
Digital integration70
Site assembly dependency25

Evidence confidence · 44%

Intensity is high if the reported system is accurate. Confidence is limited because the evidence is largely party-claimed.

Not a sustainability rating. High intensity can still fail coherence.

Coherence Score

Unknown / insufficient evidence

Assembly speed is not a whole-system energy or ecological result. Transport, steel intensity and operating performance are not evidenced here.

  • Embodied energy · Unknown · unknown
  • Transport / logistics · Unknown · unknown
  • Construction time · Unknown · unknown

Building anatomy

Factory → transport → site → operation, where known.

structure
Factory steel modules — reported
facade
Module faces — reported
bathrooms
In-module — reported
mep
In-module — reported

Timeline

Planned versus actual, when both exist.

  1. Announcement

    2010s

  2. Design

  3. Approval

  4. Contract

  5. Manufacture

    Reported as concurrent with assembly

  6. Shipping

  7. Installation

    Reported in days — not independently timed here

  8. Completion

  9. Occupancy

    Reported

Supply chain

Performance

time
Reported as exceptionally short assembly — not independently verified in this seed
embodiedEnergy
Unknown / insufficient evidence