Changsha, Hunan · High-rise volumetric steel

Mini Sky City / T30 (Changsha)

ReportedMOCKOccupancy

Canonical reported case of extreme assembly speed. MMC Sentinel keeps the claim, the missing independent timing, and the unmeasured entropy boundary in the same frame.

Dwellings
Unknown / insufficient evidence
GFA
Unknown / insufficient evidence
Value
Unknown / insufficient evidence
Duration planned / actual
— / —

Evidence confidence · 44%

MMC Intensity

88 / 100

Estimated
Structure90
Façade80
MEP85
Volumetric content92
Digital integration70
Site assembly dependency25

Evidence confidence · 44%

Intensity is high if the reported system is accurate. Confidence is limited because the evidence is largely party-claimed.

Not a sustainability rating. High intensity can still fail coherence.

Coherence Score

Unknown / insufficient evidence

Assembly speed is not a whole-system energy or ecological result. Transport, steel intensity and operating performance are not evidenced here.

  • Embodied energy · Unknown · unknown
  • Transport / logistics · Unknown · unknown
  • Construction time · Unknown · unknown

Building anatomy

Factory → transport → site → operation, where known.

structure
Factory steel modules — reported
facade
Module faces — reported
bathrooms
In-module — reported
mep
In-module — reported

Timeline

Planned versus actual, when both exist.

  1. Announcement

    2010s

  2. Design

    —

  3. Approval

    —

  4. Contract

    —

  5. Manufacture

    Reported as concurrent with assembly

  6. Shipping

    —

  7. Installation

    Reported in days — not independently timed here

  8. Completion

    —

  9. Occupancy

    Reported

Supply chain

Performance

time
Reported as exceptionally short assembly — not independently verified in this seed
embodiedEnergy
Unknown / insufficient evidence