
Tengah, Singapore · Public housing township
Tengah (HDB, DfMA)
Governance and digital delivery as industrialisation, not only modules on trucks.
- Dwellings
- Unknown / insufficient evidence
- GFA
- Unknown / insufficient evidence
- Value
- Unknown / insufficient evidence
- Duration planned / actual
- — / —
Evidence confidence · 60%
MMC Intensity
80 / 100
Evidence confidence · 60%
Digital delivery and MEP prefabrication are first-class in the Singapore method. Seed score is directional.
Not a sustainability rating. High intensity can still fail coherence.
Coherence Score
Unknown / insufficient evidence
Township-scale energy, transport and ecological boundary not assembled.
- Embodied energy · Unknown · unknown
- Transport / logistics · Unknown · unknown
- Construction time · Unknown · unknown
Building anatomy
Factory → transport → site → operation, where known.
- structure
- DfMA / PPVC mix — programme-level
- mep
- Prefabricated MEP as policy object
Timeline
Planned versus actual, when both exist.
Announcement
2016+
Design
—
Approval
—
Contract
—
Manufacture
—
Shipping
—
Installation
—
Completion
—
Occupancy
Staged
Supply chain
- Manufacturer · Housing & Development Board
- Factory · Singapore PPVC production yard (composite)
- System · PPVC (Singapore)
- System · Precast concrete
- System · Prefabricated MEP
- affects · mmc:policy:sg:dfma → mmc:project:sg:tengah
Performance
Unknown / insufficient evidence